Principle Instigator
    Kennedy Mwetich Kwenyi
    Abstract

    The rapid increase in the number of vehicles on Kenyan roads has created a major social
    problem-the loss of lives through road accidents. According to Renfro (2007) in most cases,
    these structures are built in response to user demand for safe crossing where they previously did
    not exist. In Kenya, the government provided considerable number of pedestrian’s footbridges on
    various major roads so as to ensure safe crossing of pedestrians and to reduce the existing
    pedestrian’s vehicular conflicts. The same has been witnessed along ladhis road Muthurwa area
    where muthurwa footbridge is located. These accidents can be avoided by providing pedestrian
    crossing facilities such as footbridges. Kenya has highest road fatality rates in the world with
    average of 7 deaths from the road crashes that occur everyday report on recommendation on
    integrated national transport policy (2004).this study was thus done with the objective of
    accessing the usability of Muthurwa footbridge its impact on safety and economy. Data was
    collected on pedestrian count, pedestrian speed and oral interviews the data was analyzed and the
    peak hourly pedestrian volume was 141.it is concluded that the usability of the footbridge is low
    many pedestrians shun away from the footbridge due to various reasons such as insecurity, poor
    lighting and poor ramp construction. Many proposals were made to improve the footbridge
    usability. The footbridge is used by both genders fairly balanced. The footbridge is used by
    various age groups and according to the results there was no respondent on the age group 0-15
    and above 60 years. The most users of the bridge are age group 17-30. The footbridge was used
    by pedestrians of various occupations with the business occupation leading with 60% of the
    pedestrians. The study shows that muthurwa footbridge is not fully utilized as intended it is
    neglected and most pedestrians prefer using the grade. Due to limited time to conduct the survey
    and collection of data the results obtain maybe not be that accurate. Some of the respondents
    were not ready to participate in the interview some gave wrong information while others were in
    hurry to leave. This research was carried out so that through its findings it would give
    information on whether the footbridge was being utilized or not having find out that it is not
    utilized the concerned parties should focus on liable projects.

     

    Project Code
    FCE 590
    Project Status
    Current