Principle Instigator
    NewtonOchiengOkot
    Abstract

    Thisprojectreportdetailsthedesignofarawwatertreatmentplantforsupplyto
    Rongai
    Town.
    Aprojectedtwenty-yearwaterdemandsurveyindicatesasupplyneedofabout
    4,000,000litresofwaterperday.
    Thetreatmentplantdesignedistoproducesafepotablewatertomeetthisdemand.
    Inaddition,thesiteplanfortheplacementofthetreatmentplanthasbeen
    developedinthisreport.
    ThedesignhasbeendoneinaccordancetothespecificationsinthePracticeManual
    for
    WaterSupplyServicesinKenya,bytheMinistryofWaterandIrrigation.Inaddition
    hydraulicconceptshavebeenutilisedtoproducethecalculations.
    ReferencehasalsobeenmadetotheAmericanWaterWorksAssociationtreatment
    plantdesignguide.
    Thecomponentsoftreatmentworkssizedinclude;aninletandmixingchamber,two
    flocculatingchambersofdimensions9.75m by6.45m by1.5m,threesedimentation
    tanks
    eachofdimensions15m by4m by3.1m,fourfilterchamberseach4m long,3m
    wideand3.75m deep,backwashtankofcapacityof80m3andcontacttankof
    capacityof100m3.

    Project Code
    FCE590
    Project Status
    Current